
Unpacking
Your packing box should contain the following items:
• The Vision800X chassis with the S-Link card pre-installed.
• H-Linkcard(iftheVision800XissupliedaspartofacompleteconguredsystemwithaVision800host
machine then this H-Liink card will be pre-installed in the Vision800)
• Cables(SeequantityguideFig.1)
Note:
When shipped, the Vision800x may contain transit packaging INSIDE the chassis, this must be re-
moved prior to operation.
To remove the packaging, remove the chassis lid via the four screws, two located on each side of the
case lid.
Cables-QuantityGuide
x2Genlock2
Cables
x1 Ex-Cable
Fig.1
Kommentare zu diesen Handbüchern